Flag/

Australia Supplier Home

Share
Share on MySpace
Share on Bebo
Loading
 
Advertising
Aluminium
Apparel Fabric Supply
Automation
Banking
Bakery Equipment
Bread and Bakery
Brick
Canvas
Carpet
Chain Fence
Coal
Commercial
Compressed Air
Confectionary
Contracting Supplies
Cotton
Dairy Products
Die Casting
Door Hardware
Drilling Service
Fabricated Wire
Flour
Fodder
Food and Beverages
Food Equipment
Furnishing Fabric
Greeting Card
Honey Bee Industry
Ingredients - Confectionary
Insurance
Lighting
Machine Tools
Machinery
Marina
Medicine - Pharmaceutica
Metal Recycling Industry
Mining Company
Office Fitter
Packaging
Painting and Painter
Paper Industry
Pet Foods
Pipe
Power Tools
Private Equity
Reinforce Steel
Sawmill
Ship Owner
Ship Builder
Shipping
Shop Fitting
Spring Manufacturer
Stainless Steel Fabricator
Storage
Timber
Visual and Designs
Venture Capitals
Water Treatment
Wine Importers
Wine Industries
Wood Plantation
 
 

 

Copyright 2009-2013  Australia  Supplier
Requet of changes, listing, etc, pleaes contact us through info [a] australiasupplier.com

Bakery Equipment Supplier Listing

Krause Pacific P/L

Tel: +61 (07) 5426 4322
Fax: +61 (07) 5426 4680

 www.krausepacific.com.au 

Krause Pacific P/L have been designing and building bulk flour systems for the Australian Bakery Industry for almost 30 years. The Krause flexible silo is the most modern and up-to-date flexible silo available, offering fully anti-static flexible silos for greater safety, available in capacities from 1 tonne up to 50 tonne and are supported in the "clean design" frame. Krause Pacific offers a full silo cleaning service, available to all flexible silo users.

Krause only selects proven locally available system components ensuring easy maintenance and reduced downtime. Krause Pacific is also a leading supplier of flexible sugar silos, the use of anti-static fabric and the "independent" vibratory discharger, the most efficient and safest flexible silo available. Krause Pacific offers on site inspections, advice and speedy quotations, with our manufacturing and installation times generally 8-10 weeks.