Flag/

Australia Supplier Home

Share
Share on MySpace
Share on Bebo
Loading
 
Advertising
Aluminium
Apparel Fabric Supply
Automation
Banking
Bakery Equipment
Bread and Bakery
Brick
Canvas
Carpet
Chain Fence
Coal
Commercial
Compressed Air
Confectionary
Contracting Supplies
Cotton
Dairy Products
Die Casting
Door Hardware
Drilling Service
Fabricated Wire
Flour
Fodder
Food and Beverages
Food Equipment
Furnishing Fabric
Greeting Card
Honey Bee Industry
Ingredients - Confectionary
Insurance
Lighting
Machine Tools
Machinery
Marina
Medicine - Pharmaceutica
Metal Recycling Industry
Mining Company
Office Fitter
Packaging
Painting and Painter
Paper Industry
Pet Foods
Pipe
Power Tools
Private Equity
Reinforce Steel
Sawmill
Ship Owner
Ship Builder
Shipping
Shop Fitting
Spring Manufacturer
Stainless Steel Fabricator
Storage
Timber
Visual and Designs
Venture Capitals
Water Treatment
Wine Importers
Wine Industries
Wood Plantation
 
 

 

Copyright 2009-2013  Australia  Supplier
Requet of changes, listing, etc, pleaes contact us through info [a] australiasupplier.com

Pipe  Industry & Pipe Contracting Listing

Quantm Pty Ltd

Level 4, 333 Flinders Lane,
Melbourne VIC 3000 
Australia

Tel: +61 (03) 9620 3445 
Fax: +61 (03) 9620 3446 

robert.baker@quantm.net
  
 www.quantm.net  

Quantm Pty Ltd, a Trimble company, provides corridor identification and alignment optimisation services to the linear infrastructure industry. 2009 will see the launch of Quantm's new route optimisation system that has been specifically developed to address the needs of the gas transmission pipeline owners and developers. 

The system integrates land use constraint mapping, construction limitations and cost estimation into a single analysis. It optimises to determine routes that deliver the lowest pipeline construction costs subject to the unit costs and constraint data defined by the user. Variations arising from changes in unit costs, geology or emerging constraints can be re-optimised and costed within minutes. 

The system allows pipeline development teams to meet complex environmental, landowner and construction constraints; minimise construction cost; and reduce project planning time. The system can be used at the macro/strategic project stage and the tactical stage, to support land owner access negotiations. It will extend the boundaries of financial analysis of pipeline development, lower the risk profile and deliver improved project viability.